Project Work Plan 100-N Area Strontium-90 Treatability Demonstration Project

Project Work Plan 100-N Area Strontium-90 Treatability Demonstration Project
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:1061406576
ISBN-13 :
Rating : 4/5 (76 Downloads)

Book Synopsis Project Work Plan 100-N Area Strontium-90 Treatability Demonstration Project by :

Download or read book Project Work Plan 100-N Area Strontium-90 Treatability Demonstration Project written by and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The 100-N Area Innovative Treatment and Remediation Demonstration (ITRD) identified phyto?remediation as a potential technology both for the removal of 90Sr from the soil of the riparian zone and as a filter for groundwater along the Columbia River. Recent greenhouse and growth chamber studies have demonstrated the viability of phytoextraction to remove 90Sr from this area's soil/water; in conjunction with monitored natural attenuation and an apatite barrier the process would make an effective treatment for remediation of the 100-N Area 90Sr plume. All activities associated with the 100-NR-1 and 100-NR-2 Operable Units of the Hanford 100-N Area have had, and continue to have, significant regulatory and stakeholder participation. Beginning in 1998 with the ITRD process, presentations to the ITRD TAG were heavily attended by EPA, Washington State Department of Ecology, and stakeholders. In addition, three workshops have been held to receive regulatory and stakeholder feedback on monitored natural attenuation, the apatite barrier, and phytoremediation; these were held in Richland in August 2003, December 2004, and August 2005. The apatite injection treatability test plan (DOE 2005) describes phytoremediation as a technology to be evaluated during the March 2008 evaluation milestone as described in the Tri-Party Agreement change request (M-16-06-01 Change Control Form). If, during this evaluation milestone, phytoremediation is favorably evaluated it would be incorporated into the treatability test plan. The phytoremediation treatability test described in this proposal is strongly supported by the Washington State Department of Ecology.


Project Work Plan 100-N Area Strontium-90 Treatability Demonstration Project Related Books

Project Work Plan 100-N Area Strontium-90 Treatability Demonstration Project
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 2006 - Publisher:

DOWNLOAD EBOOK

The 100-N Area Innovative Treatment and Remediation Demonstration (ITRD) identified phyto?remediation as a potential technology both for the removal of 90Sr fro
100-N Area Strontium-90 Treatability Demonstration Project
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 2010 - Publisher:

DOWNLOAD EBOOK

Strontium-90 (90Sr) is present both in the aquifer near the river and in the vadose and riparian zones of the river's shore at 100-NR-2. Phytoextraction of 90Sr
100-N Area Strontium-90 Treatability Demonstration Project
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 2009 - Publisher:

DOWNLOAD EBOOK

Strontium-90 (90Sr) exceeds the U.S. Environmental Protection Agency's drinking water standards for groundwater (8 picocuries/L) by as much as a factor of 1000
Behaviour of Strontium in Plants and the Environment
Language: en
Pages: 178
Authors: Dharmendra K. Gupta
Categories: Science
Type: BOOK - Published: 2017-10-26 - Publisher: Springer

DOWNLOAD EBOOK

This book provides extensive and comprehensive knowledge to researchers and academics who work on strontium contaminated areas. Topics covered include impact on
Strontium Contamination in the Environment
Language: en
Pages: 250
Authors: Pankaj Pathak
Categories: Science
Type: BOOK - Published: 2019-06-04 - Publisher: Springer

DOWNLOAD EBOOK

This book provides an authoritative review of the origin and extraction of strontium and its impact on the environment. It also presents the latest strontium de