Completion Report for Well ER-20-12

Completion Report for Well ER-20-12
Author :
Publisher :
Total Pages : 237
Release :
ISBN-10 : OCLC:958232454
ISBN-13 :
Rating : 4/5 (54 Downloads)

Book Synopsis Completion Report for Well ER-20-12 by :

Download or read book Completion Report for Well ER-20-12 written by and published by . This book was released on 2016 with total page 237 pages. Available in PDF, EPUB and Kindle. Book excerpt: Well ER-20-12 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area Activity. The well was drilled from October 2015 to January 2016 as an addition to the Central and Western Pahute Mesa corrective action units 101 and 102 the Phase II drilling program. Well ER-20-12 was identified based on recommendations of the Pahute Mesa Guidance Team as a result of anomalous tritium detections in groundwater samples collected from Well PM-3 in 2011 and 2013. The primary purpose of the well was to provide information on the hydrogeology in the area downgradient of select underground tests on Western Pahute Mesa and define hydraulic properties in the saturated Tertiary volcanic rocks. The main 46.99-centimeter (cm) (18.5-inch [in.]) borehole was drilled to a depth of 765.14 meters (m) (2,510.3 ft) and the hole opened to 66.04 cm (26 in.); followed by the 50.80-cm (20-in.) surface casing, which was installed and sealed with cement; and a piezometer (p4) was set in the Timber Mountain welded-tuff aquifer (TMWTA) between the casing and the open borehole. The borehole was continued with a 46.99-cm (18.5-in.) drill bit to a depth of 1,326.53 m (4,352.16 ft), and an intermediate 24.44-cm (9.625-in.) casing was installed and sealed to 1,188.72 m (3,900.00 ft) A piezometer (p3) was installed across the Calico Hills zeolitic composite unit (CHZCM) (lava-flow aquifer [LFA]) in the annulus of the open borehole. Two additional piezometers were installed and completed between the intermediate casing and the borehole wall, one (p2) in the CHZCM and one (p1) in the Belted Range aquifer (BRA). The piezometers are set to monitor groundwater properties in the completed intervals. The borehole was continued with a 21.59-cm (8.5-in.) drill bit to a total depth of 1,384.80 m (4,543.33 ft), and the main completion 13.97-cm (5.5-in.) casing was installed in the open borehole across the Pre-Belted Range composite unit (PBRCM). Data collected during hole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs, hydrophysical logs, percussion core samples, water-quality measurements (including tritium), and water-level measurements. The well penetrated 1,384.4 m (4,543.33 ft) of Tertiary volcanic rocks. The stratigraphy and lithology were generally as expected with one noted exception. A thick lava -flow and related ash-flow tuffs were identified as Calico Hills Formation (Th), and no Crater Flat units were noted. Additionally, many of the Thirsty Canyon and Timber Mountain units were thicker than expected. Fluid levels measured in the borehole during drilling are the following: (1) on November 2, 2015, Navarro measured the fluid level in the borehole at a depth of 492.33 m (1,615.25 ft) below ground surface (bgs); (2) Schlumberger and COLOG recorded fluid levels during geophysical logging on November 4 and 5, 2015, at a depth of 492.86 m (1,617 ft) and 492.25 m (1,615 ft) bgs, respectively; and (3) on December 4, 2015, COLOG and Navarro measured fluid level in the 20-in. casing with an open borehole to 1,326.54 m (4,352.16 ft) bgs at 575.77 m (1,889.00 ft) and 574.03 m (1,883.3 ft) bgs, respectively. These and subsequent water-level measurements indicate a potential head difference of greater than 76.2 m (250 ft) for groundwater in aquifers above and below the Upper Paintbrush confining unit (UPCU). As expected, tritium was occasionally measured above the Safe Drinking Water Act limit (20,000 picocuries per liter [pCi/L]). Lab analysis on four bailed samples and taken from the undeveloped well indicate that the tritium activities average approximately 36,545 pCi/L. All Fluid Management Plan (FMP) requirements for Well ER-20-12 were met. Analysis of monitoring samples and FMP confirmatory samples indicate that fluids generated during drilling at ER-20-12 met the FMP criteria for discharge to the lined sump and designated infiltr ...


Completion Report for Well ER-20-12 Related Books

Completion Report for Well ER-20-12
Language: en
Pages: 237
Authors:
Categories:
Type: BOOK - Published: 2016 - Publisher:

DOWNLOAD EBOOK

Well ER-20-12 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area
Well Completion Report for Well ER-20-11, Corrective Action Units 101 and 102
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 2013 - Publisher:

DOWNLOAD EBOOK

Well ER-20-11 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental
Completion Report for Well Cluster ER-20-5
Language: en
Pages: 200
Authors:
Categories:
Type: BOOK - Published: 1997 - Publisher:

DOWNLOAD EBOOK

The Well Cluster ER-20-5 drilling and completion project was conducted for the US Department of Energy, Nevada Operations Office (DOE/NV), in support of the Nev
Municipal Reports for the Fiscal Year ....
Language: en
Pages: 1358
Authors: San Francisco (Calif.). Board of Supervisors
Categories: San Francisco (Calif.)
Type: BOOK - Published: 1912 - Publisher:

DOWNLOAD EBOOK

Reports Dealing with the Systematic Geology and Paleontology of Maryland.
Language: en
Pages: 328
Authors: Maryland Geological Survey
Categories:
Type: BOOK - Published: 1913 - Publisher:

DOWNLOAD EBOOK

"Bibliography [of the eocence deposits of Maryland]," vol. 1, p. 31-43.