Delay Analysis of Pacific Fleet Underway Replenishments
Author | : Carlysle Arden Douglas |
Publisher | : |
Total Pages | : 146 |
Release | : 1970 |
ISBN-10 | : OCLC:227596462 |
ISBN-13 | : |
Rating | : 4/5 (62 Downloads) |
Download or read book Delay Analysis of Pacific Fleet Underway Replenishments written by Carlysle Arden Douglas and published by . This book was released on 1970 with total page 146 pages. Available in PDF, EPUB and Kindle. Book excerpt: An operational analysis of the delays incurred in Underway Replenishments of the Pacific Fleet, December, 1967-April, 1969, is conducted. Twenty specific delays are analyzed from the UNREP data of which more than 80% was from UNREPs conducted in Southeast Asia by supply ships providing logistic support to naval units engaged in combat operations. Delay occurrence distributions are derived; delay time distributions are derived and tested for goodness-of-fit with the Kolmogorov-Smirnov test. Delay as a function on the following UNREP attributes is analyzed: supply ship class, receiver ship type, time: day or night, location: EASTPAC or WESTPAC, simultaneous receivers or a single receiver, delivery method, product delivered, length of supply ship deployment, and weather. (Author).